Formation Leader, Liberty II, Knox

(17 - 18 October, 18 - 24 October, 24 October - 4 November 1967)

 

Only two days after leaving Operation Kingfisher, Lieutenant Colonel Englisch's BLT 2/3 began Operation Formation Leader in support of the 2d Battalion, 26th Marines. Envisioned as an area control operation, Formation Leader focused on the stabilization of coastal Thua Thien Province east of Route1, specifically Vin Loc and Phu Loc Districts. Because of the impending Vietnamese National Assembly elections, intelligence officers presumed that the Communists would concentrate disruptive efforts against these populated districts.

The Communists did not respond. BLT 2/3's greatest problems during Formation Leader were non-tactical. Because of the grounding of the CH-46s, all troop lifts from the USS Tripoli relied upon CH-53s from Lieutenant Colonel Joseph L. Sadowski's HMH-463, operating from Marble Mountain. The lifts were entirely satisfactory, but realigning the BLT's serial assignment tables for the larger helicopters gave Major Douglas W. Lemon's Battalion S-3 office a good pre-landing workout. Additionally, high seas and bad weather slowed the landing of attached heavy vehicles at Hue. In fact, some remained on board for the duration of the operation.

There were no enemy contacts on the 17th and at 1000 on the 18th, BLT 2/3 shifted to the 3d Marine Division's operational control. Formation Leader terminated and a new operation, Liberty II, started, but STY Bravo's mission and operational area remained the same. The enemy still did not respond. The most significant incident was the sighting and subsequent artillery attack on an enemy squad late on the 21st. Sadly, the next day five Marines on a trash-burning detail suffered wounds from the explosion of a grenade apparently dumped in the trash. Liberty II ended at 0800 on the 24th and Operation Knox started.

Shifted to the operational control of the 7th Marines, the BLT moved by truck to a new assembly area 11 kilometers east of Phu Loc. There, it began sweep operations under the direction of the 7th Marines, and during the next 13 days the battalion experienced 12 enemy contacts, mostly mortar fire. The Marines killed two enemy soldiers, but Knox had a debilitating effect on BLT 2 / 3. Two Marines died in accidents and, of the 78 nonfatal casualties, only 15 were the result of enemy action. Fungus infections claimed 33 victims. Knox ended at 1000 on 4 November; however, bad weather prevented re-embarkation. Instead all elements of the BLT moved to the Da Nang Force Logistic Command facility.