Operation Turner

 

Working with the 3d Division concept, Colonel· Sherman's staff developed the plans for the operation, codenamed Turner. A platoon from Company I, 3d Battalion, 4th Marines, reinforced with a machine gun team, a forward air control team, and demolitions and engineer personnel, was to carry out the mission. With the attack force divided into two groups, one element was to destroy the ammunition within the compound while the second exploded two pallets of small arms ammunition that had been airdropped southwest of the camp during the March fighting. The remaining platoons of Company I would stay at Phu Bai as a reserve reaction force.

After extended rehearsals and one or two postponements, Operation Turner went off smoothly. On 23 June, under cover of Marine fixed- wing aircraft and armed Hueys from VMO-2, six CH-46s from HMM-164 lifted the attack force into A Shau. Arriving at their destination prior to 0700, both groups completed their missions and were once more airborne within two hours. The Marines were back at Phu Bai by 0915, having seen no sign of any enemy force in the objective area.

If the 95th NVA had become a phantom regiment, the allies had little difficulty in locating the battalions of the 6th NVA which had moved into the coastal region of southern Quang Tri and northern Thua Thien Provinces. As a result of their contact with the 808th Battalion in Lam Son-283 north of Quang Tri City, the South Vietnamese learned that the remaining two battalions of the enemy regiment, the 806th and 812th, were in Quang Dien District in Thua Thien. On 23 June, an ARVN patrol in the district, operating just .north of the 0 Lau River ran into a strong enemy force and sustained heavy casualties. After looking at the available intelligence, U.S. advisors to the 1st Division and the 4th Marines staff believed that both the 806th and 812th had entered the old Operation Oregon area and were deployed along Route 597

Acting on this information, Colonel Sherman and his staff on 24 June visited the 1st ARVN Division Headquarters at Hue where they worked out a concept for a combined operation. Quickly approved by the various echelons of command, the resulting plan called for the helilifting of two Marine battalions into an area of operations bounded by the 0 Lau River on the north and west, and Route 1 to the south. The 2d Battalion, 4th Marines would land in the northwest sector and attack along Route 597 toward blocking positions established by the 2d Battalion, 1st Marines, approximately 6,000 meters to the southeast. The 4th Marines command group together with the artillery battalion, the 3d Battalion, 12th Marines, and other support forces would move by road convoy along Route 1 into the southern portion of the operational area, just north of Phong Dien. Company I, 3d Battalion, 4th Marines was the regimental reserve for the operation and the 3d Battalion remained ready to provide additional companies if needed. The 1st ARVN Division in the companion operation, Lam Son-284, was to establish blocking positions to the north of the Marine operation, across the 0 Lau River. A Navy destroyer stood offshore to provide naval gunfire while the 1st Marine Aircraft Wing would furnish both fixed-wing and helicopter air support.